slipstream Book a call
Use caseCorporate legal

Board and compliance reporting

The quarterly board pack and compliance reports assembled from the systems that already hold the numbers — every figure traceable to its source.

The problem

Every quarter someone rebuilds the board pack by hand: matter counts, litigation exposure, spend against budget, regulatory items, policy attestations. The figures come from several systems and more spreadsheets, and nobody can say with confidence that they tie out.

How we would run it.

Five stages, applied to this work →
  1. STAGE 1EvidenceCollect the last few board packs and compliance reports, and trace each figure back to where it came from. Most packs carry numbers nobody can re-derive.Leaves behind: a written picture of the current state, with its gaps named.
  2. STAGE 2BaselineMeasure how long each pack takes to assemble, how many people touch it, and how many figures change between first draft and final.Leaves behind: a baseline measurement both sides agree on.
  3. STAGE 3DesignAgree one definition for each reported figure and the system it comes from, and mark which items always need a lawyer's narrative rather than a number — that line is the whole design.Leaves behind: a design your architecture and risk leads have approved.
  4. STAGE 4ShipAssemble the next quarter's pack from the agreed sources, alongside the manual process, and reconcile the two line by line before the board sees either.Leaves behind: working software or a live process, in production.
  5. STAGE 5ProveReport assembly time and late corrections against the baseline, and keep the definitions as the department's reporting standard for the next quarter.Leaves behind: a result measured against the baseline, and an instrument you keep.

What you get

  • — A definition and source for every reported figure
  • — A draft pack assembled each quarter from those sources
  • — A reconciliation showing each figure ties out
  • — A compliance calendar for attestations and filings

What it needs from you

  • — The last two to four board packs and compliance reports
  • — Read access to the matter, spend and compliance systems
  • — The general counsel, or a deputy, to own what the board sees

How we'd know it worked

  • — Time to assemble the pack, against the baseline
  • — Figures corrected after the first draft
  • — Board and audit-committee questions the pack already answers
Where it starts

Starts as a sprint. Grows into a program.

SPRINTThree Metrics That MatterThree numbers your CFO believes, with the plumbing to refresh them.Read more → PROGRAMOperating Model & TransformationFix how the work is staffed, routed and measured — not just the tools.Read more →

This describes our approach, not an account of a client engagement.

Start with one sprint.

Two to three weeks, one approver, a deliverable you keep. Scope, date and fee back within one business day.

Scope this as a sprint